SAP-CO : Product Cost By CO Production Order | W/o Qty Str

Product Cost Without Qty Structure | No PP Module | CO-Production Order | Production And Sales Cycle | Material Ledger

Description


Language : Urdu/Hindi

Product Cost By CO-Production Order

The scenario, without quantity structure costing method is used when a material master exists for a product, but a bill of material (BOM) and routing do not. For example, you can use this costing method for products that are still in the prototype phase, but for whom a product cost is required.

You can also use this method for valuating intangible goods such as services for which there is no BOM or routing. With this method you can carry out a cost for materials even if the quantity structure data (such as BOMs and routings) is located in a non-SAP Production Planning system.

Introduction & Configuration

Introduction & Configuration

Material Master & Production Process

Create Material Master (Raw Material & Finished Good)

Alternative Of BOM & Routing & Execute Cost Estimate Of FG Material

Create CO Production Order

Preliminary Cost Of CO Production Order

Raw Material Stock In

Raw Material Issue To CO Production Order

Activity Type Confirmation to CO Production Order

Goods Received Against CO Production Order

Sales Process

Create Sales Order

Delivery, Picking & Post Goods Issue

Billing

Closing

Calculate Variance

Settlement Of CO Production Order

Material Ledger – Actual Costing Run

T-Codes

MM01 | KKPAN | CK24 | KKF1 | KKF4 | MIGO | KB21N |

VA01 | VL01N | VF01 | KKS2 | KO88 | CKMLCP |

KE24 | CKM3N |


Total Students678
Original Price($)1499
Sale PriceFree
Number of lectures15
Number of quizzes0
Total Reviews23
Global Rating4.7173915
Instructor NameSimple SAP – MTJ

Reminder – Rate this Premium 100% off Udemy Course on Udemy that you got for FREEE!!

Do not forget to Rate the Course on Udemy!!


Related Posts